Rapid Response Workgroup

Oregon and Washington Dreissenid Exercise (12/11/13)

OREGON AND WASHINGTON RAPID RESPONSE WORKING GROUP MEETING SUMMARY (December 11, 2013)

1 AGENDA – Oregon and Washington Dreissenid Exercise Rapid Response Working Group

2 Exercise Overview, Objectives Lisa DeBruyckere

3 Washington State Dept. of Agriculture Steve Foss4 WA Aquatic Invasive Species Management General Permit Nathan lubliner

4 WA Aquatic Invasive Species Management General Permit Nathan lubliner

5 Endangered Species Act Compliance Nancy Munn NOAA Fisheries

6 Overview of Endangered Species Act Issues Bob Kibler USFWS

7 USFWS Endangered Species Act Contacts

Regional Response Planning Documents

Responding to an Introduction of dreissenids in Oregon and Washington (Best Management Practices, Effects Analysis) (July 2014)

Decision Matrix (July 2014)

State Planning Documents

A Review of the State of Idaho Dreissenid Mussel Prevention and Contingency Plans (AERF 2012)

Washington Dreissenid Mussel Rapid Response Plan (2014)

Columbia River Basin Plan Documents

Updated 6-6-14 Appendix E (Regulatory Requirements)

Appendix D and E of the Columbia River Basin Interagency Invasive Species Response Plan: Zebra Mussels and Other Dreissenid Species (2011)

Updated 10-10-13 TABLE 3 OREGON – Pesticide Use Matrix For An Isolated Zebra Mussel Infestation In The Columbia River Basin

Updated 10-10-13 TABLE 2 WASHINGTON- Pesticide Use Matrix For An Isolated Zebra Mussel Infestation In The Columbia River Basin

Updated 10-10-13 TABLE 4 IDAHO – Pesticide Use Matrix For An Isolated Zebra Mussel Infestation In The Columbia River Basin

Updated 11-5-13 Appendix D (Control)

Z/Q Mussels Permitting Information

Zequanox EPA Approved Master Label June 2014

Assessment of the Efficacy and Environmental Impact of Zequanox® for Zebra Mussel Control Programs in Lakes and Reservoirs (Marrone Bio Innovations 2012)

Special Local Need (SLN)- Check List (Used by EPA for state issued 24c, note: this document is several years old )

A Guide for Requesting Section 18 Emergency Exemptions from Registration in Washington State (2012)

California Zebra mussel General Permit – Chlorine, 2011

Pesticide Regulatory Education Program’s (PREP) FIFRA Section 18 Emergency Exemption Program Training Resource

Z/Q Mussel Eradication and Control Information

Quagga and Zebra Mussel Eradication and Control Information Sheets (CA Sea Grant 2013)

Final Environmental Assessment Millbrook Quarry Zebra Mussel and Quagga Mussel Eradication (2005)

FONSI and Final EA – Controlling Quagga Mussels in the Cooling Water System at Davis Dam Using Zequanox (BOR 2011)

Appendices* – Controlling Quagga Mussels in the Cooling Water System at Davis Dam Using Zequanox (BOR 2011)

*Note: Includes Correspondence and Documentation; Federal Insecticide, Fungicide, Rodenticide Act Section 18 Emergency Exemption Project File Docket; Appendix C. Treatment Evaluation Methodology; Zequanox Product Label; Manufacturer’s Material Safety Data Sheet; Research and Development Project Report Summary: Efficacy of Pf CL 145A, Formulations for the Control of Zebra and Quagga Mussels at DeCew II Generating Station, St. Catherine’s, Ontario, Canada;. Comment Letters and Response to Comments

  Articles and Reports from RNT Consulting Inc. [Note: Includes numerous dreissenid control research papers]